Friday, July 10, 2015

Dry Wall Installation

May 15th, 2015

Finally got to the drywall stage!  All of the framing issues were corrected and we now have drywall and tape done!  A few things that we have noticed already.  They dry walled over the small smurf doors in the attic, one of them where the upper HVAC unit is housed.  I have not mentioned it since the installer will be back to turn on the HVAC, it will be figured out.  The drywall ws being brought into the house in the rain so we have been back over several times to insure that drywall way not damaged or wet.  Mold is a huge issue with our son and an uninvited guest so we will keep a close eye on any potential moisture.  On to siding this week!!













No comments:

Post a Comment